Wensowitch Solar

No public record places this project more closely than Navarro County, which is outlined.
County
Navarro
Technology
Solar
Capacity
146.08 MW — EIA Form 860M gives 145.6 MW; the ERCOT queue gives 146.08 MW.
Interconnecting entity
Greenalia Solar Power Wensowitch LLC
Developer
Greenalia S.A. (Spain)
Point of interconnection
Tapping 138 kV line Telico (192) to Montfort Switch (3454)
Status
SS Completed, FIS Completed, No IA
Projected completion
18 September 2028
Queue number
24INR0205
  • Public recordGIS Report for August 2026, posted 1 September 2026, sheet “Project Details – Large Gen” ERCOT GIS Report (checked 14 September 2026)
  • Public recordEIA Form 860M, July 2026 — Plant 67567, Wensowitch Solar Park, 145.6 MW EIA Form 860M (checked 14 September 2026)

ERCOT's abbreviations: SS, the security screening study; FIS, the full interconnection study; IA, the interconnection agreement. How this page is sourced →

Queue data: ERCOT GIS Report, August 2026 (posted 1 September 2026, read 30 September 2026). ERCOT publishes it for planning only; its data comes from the project companies and may contain errors. Compiled by Blackland TX. Corrections: [email protected].