- Data center load
- Capacity
- No capacity figure exists in the primary record
- Interconnecting entity
- Provident-GRH Hillsboro, LP
- Developer
- Provident Realty Advisors Inc.
- Status
- Contract not closed; zoning not approved
Water is the stated constraint and the City said so on the record: a water-cooled design at 3.6 million gallons per day peak was rejected, an air-cooled design at 1.56 million gallons per day is under discussion, and no will-serve letter has issued.
- Public recordCity of Hillsboro's own data center transparency page — about 293.84 acres of Hillsboro EDC land inside the city limits in the John E. Ross A-750 and Ewen Cameron A-131 surveys; contract in place since Sep 2024, running through Nov 2026, amended twice; Planning and Zoning considered a text amendment adding “Data Center” to the permitted use table on 11 May and 27 Jul 2026 with no council adoption through the 15 Sep agenda Municipal record (checked 14 September 2026)
- Public recordHillsboro Municipal Management District No. 1, $81M estimated district cost; city consent conditional under Resolution R2025-03-16 Municipal record (checked 14 September 2026)
ERCOT's abbreviations: SS, the security screening study; FIS, the full interconnection study; IA, the interconnection agreement. How this page is sourced →
Queue data: ERCOT GIS Report, August 2026 (posted 1 September 2026, read 30 September 2026). ERCOT publishes it for planning only; its data comes from the project companies and may contain errors. Compiled by Blackland TX. Corrections: [email protected].