NRG Prairie Energy Center

No public record places this project more closely than Hill County, which is outlined.
County
Hill
Technology
Gas, combined cycle
Capacity
1,253 MW
Interconnecting entity
NRG Prairie Energy Center LLC
Point of interconnection
Tap #1907 Venus Switch – #3389 Fort Smith Switch 345 kV
Status
SS Completed, FIS Started, No IA
Projected completion
31 December 2030
Queue number
29INR0158

In the ERCOT generation queue, and on no public tracker as of 13 September 2026.

  • Public recordGIS Report for August 2026, posted 1 September 2026, sheet “Project Details – Large Gen” ERCOT GIS Report (checked 14 September 2026)
  • Public recordTCEQ air permit application 183570 / PSDTX1706 / GHGPSDTX272, received 31 Mar 2026, expedited — power generation at CR 4419 / FM 66 southeast of Grandview; filed with the Hill County Judge on the county projects page TCEQ (checked 14 September 2026)

ERCOT's abbreviations: SS, the security screening study; FIS, the full interconnection study; IA, the interconnection agreement. How this page is sourced →

Queue data: ERCOT GIS Report, August 2026 (posted 1 September 2026, read 30 September 2026). ERCOT publishes it for planning only; its data comes from the project companies and may contain errors. Compiled by Blackland TX. Corrections: [email protected].