BLACKLAND TXthe six towns →

← Energy and data-center projects

Kennedy Storage

Navarro Switch
It taps a transmission line that runs to Navarro Switch (marked). Where on the line is not public, and the line is not drawn. Navarro County is outlined.
County
Navarro
Technology
Battery storage
Capacity
25.3 MW
Interconnecting entity
Kennedy Bypass Solar LLC
Point of interconnection
Tap 345kV 68040 Kopprl Capacitor Yard - 68091 Navarro
Status
SS Completed, FIS Started, No IA
Projected completion
31 December 2028
Queue number
24INR0391

Kennedy Bypass Solar LLC has no Texas corporate registration. The project exists as a queue position and nothing else on record.

  • Public recordGIS Report for August 2026, posted 1 September 2026, sheet “Project Details – Large Gen” ERCOT GIS Report (checked 14 September 2026)
  • Public recordKennedy Bypass Solar LLC has no Texas corporate registration of any kind — checked against franchise tax, Secretary of State, EIA, TCEQ, Navarro County minutes, Chapter 312 and the Comptroller JETI registry. The project exists only as a queue position. No filing found (checked 14 September 2026)

ERCOT's abbreviations: SS, the security screening study; FIS, the full interconnection study; IA, the interconnection agreement. How this page is sourced →

Queue data: ERCOT GIS Report, August 2026 (posted 1 September 2026, read 30 September 2026). ERCOT publishes it for planning only; its data comes from the project companies and may contain errors. Compiled by Blackland TX. Corrections: [email protected].